Testimonials

At Sachs we pride ourselves in the quality and professionalism with which we complete all our projects. We feel this is reflected in every aspect throughout our business. We would like to share some thoughts and comments from you – our valued customers.

Lindbergh Boulevard Tunnel Project

“The planning, coordination and cooperation between Sachs Electric and McCarthy/Mosley is the true testimonial to the success of this project and the ability to beat every milestone date.”

“The management of this project as it relates to quality, safety and workforce/contractor diversity was exceptional, with the Sachs Team continually tracking and monitoring these tasks.”

Scott Beckett
Project Director, McCarthy Building Companies

Executive Floor Replacement Destroyed by Fire at Nestlé Purina PetCare

“This project was a design/build effort that had to be performed in a very tight time period while not disrupting office operations on the floors below. Sachs Electric was called upon to work not only with limited information, but with limited space with many other construction trade personnel. There were many opportunities where lesser personnel could have caused problems and yet your group consistently performed at a high level of professionalism.”

Chris Renz
Group Manager, Facility Operations
Nestle’ Purina PetCare

Relocation of St. John’s Mercy Health Care Data Operations

“Sachs Electric has been a major force in relocating the St. John’s Mercy Health Care data operations three times. SJMHC continues to work with Sachs because they are able to respond with appropriately trained manpower to meet rigid schedules along with continued expertise in all areas. Sachs provided field supervision to schedule and monitor construction and work hand-in-hand with the St. John’s information systems technicians.”

“If SJMHC were moving forward with another major IS project, Sachs Electric would again be their preferred subcontractor.

Terry Bader
Executive Director, Facilities Management
St. John’s Mercy Health Care

National Information Systems Cooperative (NiSC) New Design/Build Corporate Office

“Through our project from the original presentation to the final completion, I found Sachs Electric to be top shelf. The project was a huge success, we were able, through strong teamwork to complete a 14 month, plus 40 weather days project 2 days short of 12 months.”

Dusty Kamp
Project Superintendent, Paric Corporation

Modifications of Existing Airfield Electrical Distribution Systems
at Lambert–St. Louis International Airport

“Of particular note was the installation and switchover of the complete signage system. Scheduled months in advance with the FAA and with zero flexibility, your team performed flawlessly in redesigning nearly every taxiway at the airport over a period of 7 hours. The seamless nature of this effort has earned a Safety Award from the FAA.”

Len Dillinger, P.E.
Project Manager, PB Aviation, Inc.