Combustion Turbine Generation

  • Integrated Gasification Combined Cycle Station
  • Inland Empire
  • Ameren UE – Venice CTG 2,3, 4 and 5
  • Metcalf Power Plant
  • Reliant Energy – Big Horn
  • Reliant Energy – Aurora
  • AES Granite Ridge
  • La Paloma
  • Peno Creek
Project: Integrated Gasification Combined Cycle Station
650MW Syngas 2 on 1 combined cycle plant. Power Block and Cooling Tower electrical and instrumentation installation.
Location: Edwardsport, Indiana
Owner: Confidential
Value:  $41,000,000
Complete:  April 2012
Project: Inland Empire
Instrumentation installation on 500MW Combined-Cycle Generation Facility
Location: Romoland, California
Owner: GE Energy
Contractor:  GE Energy
Value:  $3,700,000
Complete:  June 2008

Project: Ameren UE Venice Plant, CTG Units #2, #3, #4 & #5
All electrical construction, instrumentation calibration and start-up support services for three separate additions of simple cycle combustion turbine generators to repair the station
Location: Venice, Illinois
Owner: Ameren UE
Contractor:  MC Industrial
Value:  $9,000,000
Complete:  March 2006

Project: Metcalf Power Plant
550 MW Combined Cycle Power Plant Instrumentation and Controls Installation
Location: San Jose, California
Owner: Calpine Corporation
Contractor:  MC Industrial
Value:  $2,100,000
Complete:  May 2005

Project: Reliant Energy – Big Horn
 Installation of two combustion turbines, two heat recovery steam generators, one steam turbine generator and air-cooled condensers.  Also included 230 KV switchyard and 16,000 square-foot control and administration building; waste water treatment facility
Location: Primm, Nevada
Owner: Reliant Energy
Contractor:  GSSL (Graycor, Sachs, Sargent & Lundy)
Value:  $35,000,000 (E & I combined)
Complete:  October 2003

Project: Reliant Energy – Aurora
Complete Electrical and Instrumentation on 870 MW peaking power plant; Four GE 7FA Turbines; six GE LM6000 Turbines
Location: Aurora, Illinois
Owner: Reliant Energy
Contractor:  GSSL (Graycor, Sachs, Sargent & Lundy)
Complete:  October 2003

Project: AES Granite Ridge
Complete Electrical and Instrumentation construction on 720 MW Combined Cycle Plant
Location: Londonderry, New Hampshire
Owner: AES
Contractor:  Dick Corporation
Value:  $15,000,000
Complete:  2003

Project: La Paloma Power Plant
1048 MW Combined Cycle Power Plant; Site development, underground electrical; substation/switchyard construction; loop testing and start-up
Location: McKittrick, California
Owner: PG&E Energy Group
Contractor:  Alstom Power
Value:  $14,100,000
Complete:   

Project: Ameren Peno Creek
200 MW Peaking Power Plant; Four PWPS FT8 Dual Fuel; Six Month Construction Period
Location: Bowling Green, Missouri
Owner: Ameren
Contractor:  Black & Veatch
Value:  $5,500,000
Complete:  July 2001